Pricing Proposal

Prepared for Example Enterprise · Take-home submission draft, not an official Applied Compute document.

In short

You are buying 3 managed reinforcement-learning (RL) cycles to improve Held-out pass rate for Internal workflow automation, from a measured baseline of 60% toward a target of 80%, over 6 weeks. The model is Qwen3.6-35B-A3B, an open-weight model with 35 billion parameters, of which 3 billion are active for each token. The total is $247,247. The 80% target is a review point, not a guarantee: when it is reached, or when results stop improving, you decide whether to continue. You approve every cycle, and each invoice is issued when its milestone completes. The total below covers everything in the three phases; only usage above the included allowances and the items under Not included are extra.

Where your money goes

What you pay for, phase by phase

Phase 1 · Weeks 1–2

Setup package: evaluation and environment

$49,449

What you get

Why it costs this

The foundation every RL cycle depends on: an evaluation you can trust, a grader that measures what matters, and a baseline to measure improvement against. You keep these assets and can reuse them with any future model.

Billed: Week 2, when the go/no-go gate is signed

Phase 2 · One cycle every 1 week

Managed RL cycles (3)

$173,073

What you get

Why it costs this

Each cycle runs the full loop for a standard-size model: train, generate rollouts, evaluate on held-out cases, and report. This phase is all-inclusive: compute, the agent platform, the engineers who run each cycle, and evaluation. You receive no separate compute or engineering invoices. Usage above the included allowances is billed as set out in the usage section.

Billed: Invoiced as each cycle completes

Phase 3 · Week 6

Handoff and independent verification

$24,725

What you get

Why it costs this

An independent check on data the model never trained on, plus everything your team needs to run the model without us.

Billed: Week 6, on signed handoff

When you are invoiced

InvoiceWhenAmountRunning total
Setup gateWeek 2$49,449$49,449
Cycle 1 of 3
Managed cycle, usage included
Week 3$57,691$107,140
Cycle 2 of 3
Managed cycle, usage included
Week 4$57,691$164,831
Cycle 3 of 3
Managed cycle, usage included
Week 5$57,691$222,522
Handoff and verificationWeek 6$24,725$247,247
Total training fee$247,247$247,247

What changes the price

If you…Price effectWhy
One more cycle+$42,403One more managed cycle beyond the approved count, with its compute, platform usage and engineering included.
One fewer cycle-$51,634One managed cycle less. The setup and handoff packages do not change.
Stop after cycle 1$107,140The setup invoice and the first cycle invoice. No later invoices are issued. The handoff package is not billed unless the handoff is signed.
Another workflow, data source or regionChange orderScope changes are quoted separately, through a change order, before any work starts.

What you can be charged

Maximum committed fee$247,247. The three invoices add up to this and no more, whatever the cycle timing.
Included usage3,870 GPU-hours of managed compute and 172.5 million tokens on the agent platform, which includes a 15% buffer over planned use.
Usage above those allowancesOnly with your written approval, billed at the rates in the usage section, and up to $25,000 in total without a further change order.
Committed-cycles priceAvailable when you commit to 4 or more cycles (5% off) or 6 or more (10% off).
RatesFixed for the term of this statement of work.
Price validity30 days from issue.

What one cycle includes, and what you pay if you stop

Each managed cycle includes the engineers who run it, the agent platform, the compute to train and roll out the model, and the held-out evaluation. Cycles are invoiced in equal parts of the cycle total, because each one carries the same work.

If you stop atTotal invoiced to that point
Stop after setup$49,449
Stop after cycle 1$107,140
Stop after cycle 2$164,831
Full engagement (with acceptance)$247,247

Fees are not contingent on the score. Reaching the target, or a plateau, triggers a review; you then decide whether to continue, and no later invoice is issued unless you approve it.

Adding a cycle costs $42,403: only that cycle's compute, platform use and engineering are added, while the setup and handoff do not change. The per-cycle invoice is a share of the cycle total, so it is not the price of one more cycle.

Ownership of deliverables

[The trained weights, grader, held-out evaluation set, environment and traces delivered to you: ownership and licence terms, including the base-model licence, to be confirmed by counsel.]

Not included

Words used in this proposal

RL cycle
One round of training on the model's own attempts, scoring them, and updating the model.
Rollout
One attempt by the model at a task, recorded with its result.
Held-out evaluation
A test set the model never trains on, used to measure real improvement.
Grader
The rules that score an attempt, for example pass or fail, or a rubric score.
Allowance
The compute and agent platform usage included in the price for the whole engagement. Usage above it is billed at the rates in the usage section.
Checkpoint
A saved version of the trained model, with its settings, so results can be reproduced.
Go / no-go gate
A decision point at the end of the foundation phase. You approve it before any cycle is paid for.
Change order
A short written amendment that adds or changes scope and its price before the work starts.
Statement of work (SOW)
The contract schedule that defines scope, phases, evidence, invoices and amendment rules.

Common questions

Why do I pay for the foundation before training starts?

Training is only as good as the test that measures it. The foundation builds that test, the grader and a baseline, and you keep them. It is the one part of the work that makes every later cycle measurable.

Is engineering billed separately?

No. Engineering is included in the setup and cycle prices. You are not invoiced for hours; each phase is priced for the work it delivers.

What is included in the total?

Everything in the three phases: setup, managed cycles with compute and platform usage up to the allowances, and handoff. Only usage above the allowances and the items under Not included are extra.

Why does the price depend on the model?

A larger model needs more compute for each cycle, so the managed cycle price is higher. The price shown already reflects the model you have chosen.

What if a cycle does not improve the score?

You decide after each cycle whether to continue, change direction or stop. You pay for the cycles and milestones completed. We do not stop contracted work silently, and we do not charge for work you have stopped before it starts.

What happens if I stop early?

You pay the invoices up to the stop point, and nothing more. Any third-party compute we committed for you on your approval is billed at cost. The acceptance payment is billed only on a signed handoff.

Acceptance

Each phase is accepted against the objective evidence listed in the statement of work, and each invoice follows the same milestone.